The  action  must  be  brought  within  ten  years


        following the collapse of the building. (n)




        Article 1724. The contractor who undertakes to


        build  a  structure  or  any  other  work  for  a



        stipulated  price,  in conformity  with  plans  and


        specifications  agreed  upon  with  the  land-


        owner, can neither withdraw from the contract



        nor demand an increase in the price on account


        of  the  higher  cost  of  labor  or  materials,  save


        when there has been a change in the plans and



        specifications, provided:




               (1) Such change has been authorized by the


               proprietor in writing; and




               (2)  The  additional  price  to  be  paid  to  the


               contractor  has  been  determined  in  writing



               by both parties. (1593a)